| Preparation Guide for IBM Exam Test 197 | Study Note published by: John, on 2005-03-30
pSeries Enterprise Technical Support (Test 197 )
Exam Objectives and Sub-Objectives:
Following are the objectives of this exam
1. System Planning
- Validate hardware and software capability and configuration
- Determine environmental requirements
- Determine migration planning requirements
- Determine LPAR profile requirements
- Define installation parameters
- Define boot Install Strategy
2. Installation and Configuration (LPAR)
- Install initial OS image
- Partition system
- Install OS into LPAR
- Validate LPAR
- Configure Service Aids
- Configure DLPAR
3. Hardware Management
- Configure the Hardware Management Console (HMC)
- Add/Replace Hardware
- Determine resource and LPAR dependencies
- Manage the HMC
4. On-going Support
- Perform system maintenance
- Perform system modification and reconfiguration
- Isolate causes of failure and determine appropriate action
- Analyze and optimize performance tuning
- Perform HMC maintenance
Exam Detail:
|
Number of Question: |
57 |
| Type of Questions: |
Multiple-Choice |
| Passing Score: |
65 |
| Time Duration: |
75 min |